Week 2 · Day 9 of 10
Scope and ship like a Forward Deployed Engineer
Students can run discovery with a user, scope work to a deadline, and write a design doc someone else could build from.
1LearnDiscovery, scope and design docs
How a Forward Deployed Engineer works with a company: discovery on site before building, scoping to a fixed deadline, a short design doc (the user, the problem, the architecture, what's cut, the risks), and the workplace standards that start on Monday.
How a Forward Deployed Engineer starts
- Discovery
Check your understanding
What does a Forward Deployed Engineer do first at a new client?
The deadline is in two days and three features are half done. What do you do?
What belongs in a design doc for a two-week build?
2BuildInterview, design doc, cut scope
Run a 20-minute discovery interview with a classmate playing your user, write a one-page design doc for v1.0, and cut scope to what ships tomorrow.
Done when: your design doc names the user, the scope, what's cut and the risks.
3CapstoneDesign doc in, code freeze
Design doc committed. Code freeze tonight.
4HomeworkWrite the README
Write the README: what it does, how it works, how to run it, what it costs.
For teachers: the day 9 teaching kit.